Developing the next generation of high-efficiency power infrastructure to fuel a resilient, sustainable global future.
| Ref | Project | Domain | Tools | Status | |
|---|---|---|---|---|---|
| PRJ_04 | Combined Cycle Plant Optimization | Power Generation | IAPWS-IF97, Exergy | DONE | |
Modeled a combined-cycle gas/steam plant in IAPWS-IF97 and used exergy analysis to pinpoint and reduce the cycle's largest irreversibility losses. |
|||||
| PRJ_03 | EV Battery Pack Sizing & Aging Model | Electrochemical | MATLAB | DONE | |
Built a MATLAB model to size an EV battery pack against range and power targets, then projected its capacity fade over the vehicle's service life. |
|||||
| PRJ_02 | Green Ammonia Plant Feasibility | Process / CCUS | Aspen HYSYS | DONE | |
Designed a green ammonia plant in Aspen HYSYS as a capstone project, covering the process flowsheet, mass/energy balances, and a full HAZOP safety study. |
|||||
| PRJ_01 | Manufacturing KPI Dashboard Suite | Industrial Systems | SQL, VBA | DEPLOYED | |
Built cross-site SQL/VBA dashboards at Mother Parker's to track manufacturing KPIs, and traced a recurring inventory discrepancy back to an ERP data issue. |
|||||
| Tool / Method | Category | Applied In |
|---|---|---|
| Aspen HYSYS | Process Simulation | Green ammonia plant design (Capstone) |
| MATLAB | Modeling & Simulation | EV battery pack sizing & aging model |
| IAPWS-IF97 / Exergy Analysis | Thermodynamics | Combined cycle plant optimization |
| SQL & VBA | Data Systems | Cross-site KPI dashboards, Mother Parker's |
| Lean Manufacturing / Six Sigma | Process Improvement | ERP inventory investigation (AX Dynamics) |
| HAZOP | Process Safety | Ammonia plant safety study |